Ukrayna Güneş Enerjisi Projesi

Hun Holding commissioned its solar power plant project in Ukraine, which has an installed capacity of 7 MW, in November 2019. Ukraine stands out as an attractive country in terms of solar energy investments.

The project is located in the city of Uzhgrod in Zakarpattia Oblast which has borders with the European Union. Electricity will be generated and sold for 10 years within the scope of a purchase guarantee. Ukraine has become very attractive in terms of solar energy investments due to the legal infrastructure which has been improving recently, high profitability rates thanks to guaranteed purchase prices, import tax advantages and low EPC costs.
Location
Zakarpatya Oblast, Uzhgrod
Capacity, AC Mwe
6.00
Capacity,  DC MWp
6.97
Panel
HT Solar SAAE HT60-156P 275
Invertor
Huawei SUN200 60KTL
Steel structures
Vergo
Transformer
Ulusoy
Electric Equipment
Helukabel, Ulusoy, Vekmar
COD Date
November 2019
FIT (EUR/MWh)
150.2
Specific Generation (MWh/MWp, year)
1,169
(*) Estimated values.